Wuhan Xinshengneng Technology Co., Ltd. describes the points for attention during the test of partial discharge tester

AddTime:2021-10-09 14:45:09   Views:     【 Big Mid Small 】   Print   Close

Partial discharge tester is widely used in power test. Partial discharge test is the main test item of electrical equipment insulation, in the use of partial discharge tester test, what should be paid attention to?

1, partial discharge tester test site voltage up to tens of thousands of volts, test personnel should strictly comply with all safety precautions. The test area should have obvious and clear warning signs, and everyone on site should be aware of the high pressure area. Direct test personnel should be aware of all live elements and high voltage elements in the measurement loop, and non-direct test personnel should be isolated from the test area. No one shall enter the high pressure area during the test and after the power is powered on.

2. The test site should be neat and clean, and other irrelevant items should not be stored. There should be no disorganized small metal pieces (such as bare copper wire section, screws, nuts and other small metal pieces) on the ground in the high voltage range. The tested product, boost transformer and coupling capacitor should be kept at an appropriate distance from the surrounding area.

3. The surfaces of the tested products, boost transformers and coupling capacitors should be kept dry and clean, because moisture and dirt on the surface will cause partial discharge on the surface, resulting in abnormal measurement.

4. Test operators should master test lines, test methods, test steps and test purposes. Before the test began to pressure, the first connection line according to the requirements of the rules, the test area of various metal objects should be firmly grounded, and then check and improve the test area of all possible discharge parts (such as not sharp, acute Angle), especially should pay attention to the grounding line, high voltage line and strong electric circuit is firmly connected.

5, for the connection line should avoid exposure to prevent corona discharge, especially for the voltage level of higher partial discharge test, when necessary to thick high voltage connection line and install anti-corona cover, reduce the corona discharge caused by too high field strength. Shielding cover should not contact the porcelain skirt of the sample.

6, under normal circumstances, in the process of the test, the test in the pressure, pre-boost local discharge is much larger than the normal value, at this time the instrument instrument is bound to exceed the full scale. In order to prevent the instrument from being damaged, the gain coarse adjustment knob of the instrument should be rotated one or more steps counterclockwise, so as not to exceed the full scale as the standard. When the voltage drops to the measured voltage, the gain coarse switch is rotated one or more steps clockwise to record the measured value.

7, when the test is abnormal, the power supply should be cut off first, and then for further processing.

Wuhan Xinshengneng Technology Co., Ltd. is a professional manufacturer of electric power testing equipment, producing high voltage testing equipment with complete models, powerful functions, stable performance and wide range of use. It is favored by many electric power workers. Welcome to inquire 0312-3188565.


Prev:Wuhan Xinshengneng Technology Co., LTD describes the operation of digital double clamp phase voltammeter  Next:Wuhan Xinshengneng Technology Co., Ltd. describes the main differences between AC and DC voltage withstand


Back To Top

Qr code scan

Copyright © Wuhan Xinshengneng Technology Co., Ltd. All Rights Reserved  鄂ICP备2020019985号-1   Web site productionsanjin.net